關(guān)于電纜橋架修復和維護的方法

電子工業(yè)是國民經(jīng)濟支柱工業(yè)之一,也是新式科學技術(shù)開展工業(yè)。電纜的防護就會顯得特別重要,運用濟南電纜橋架能夠起到電纜防塵防腐等損傷電纜運用壽命的狀況呈現(xiàn)。下面整合了關(guān)于電纜橋架怎么修復和維護的方法,得當?shù)木S護可以延長電纜橋架的使用壽命。
The electronic industry is one of the pillar industries of the national economy, and it is also a new type of scientific and technological development industry. The protection of cables will be particularly important. The use of cable tray in Jinan can play a role in the situation of cable dust prevention, corrosion prevention and other damage to the service life of cables. The methods of repair and maintenance of cable tray are integrated below. Proper maintenance can extend the service life of cable tray.
電纜橋架修復:
Repair of cable tray:
1.銹跡處理
1. Rust treatment
通常電纜橋架采用氯磺化底漆二道進行兩部分除銹,表面除銹處理質(zhì)量直接影響防腐工程的壽命,現(xiàn)場除銹通常是砂輪機或者人工除銹,在表面處理之后,在4小時內(nèi)涂上底漆。如果處理不當發(fā)現(xiàn)有新銹,必需進行重新處理。
Generally, cable tray is subject to two parts of rust removal with two layers of chlorosulfonated primer. The quality of surface rust removal treatment directly affects the service life of the anti-corrosion project. The on-site rust removal is usually performed with a grinder or manually. After surface treatment, the primer is applied within 4 hours. If new rust is found due to improper handling, it must be re treated.
2.涂層處理
2. Coating treatment
涂層工藝分為刷涂、滾涂。刷涂或者滾涂時每層應從橫交錯反復進行涂,直到均勻為止,不能出現(xiàn)漏涂。
The coating process is divided into brush coating and roller coating. When brushing or rolling, each layer should be applied repeatedly in a horizontal and staggered manner until uniform, and there should be no leakage.
3.施工環(huán)境要求
3. Construction environment requirements
環(huán)境需要通風良好,溫度好在13℃-30℃,不得低于5℃,相對濕度保持在80%以內(nèi)。不宜在強烈日光下施工。遇到雨、霧、強風氣候不得在室外進行施工。
The environment needs to be well ventilated, with a temperature of between 13 ℃ and 30 ℃, not less than 5 ℃, and a relative humidity of within 80%. Construction should not be carried out in strong sunlight. Construction shall not be carried out outdoors in rainy, foggy, or windy climates.
濟南電纜橋架
電纜橋架維護:
Cable tray maintenance:
1.避免擺放在高溫潮濕地方。
1. Avoid placing in hot and humid areas.
2.避免與腐蝕性液體接觸。
2. Avoid contact with corrosive liquids.
3.可用電纜橋架專用的保養(yǎng)蠟進行保養(yǎng)。
3. Special maintenance wax for cable tray can be used for maintenance.
4.定期清理電纜橋架表面的灰塵與銹跡。
4. Regularly clean the dust and rust on the surface of cable tray.
此外在運輸、裝卸電纜橋架時,電纜橋架架應牢固地系在車輛上,以免碰撞和損壞電纜橋架。卸貨時,電纜橋架架不得直接從車上推下,搬運時注意避免碰撞;存放時,必須分門別類堆放,不得敲擊。這些層應該用軟物體分開。
In addition, during the transportation, loading and unloading of cable tray, the cable tray frame shall be firmly tied to the vehicle to avoid collision and damage to cable tray. When unloading, the cable tray frame shall not be pushed down directly from the vehicle, and collision shall be avoided during handling; When storing, they must be stacked in different categories and must not be knocked. These layers should be separated by soft objects.
請勿在電纜橋架上放置重物,以免超重的電纜橋架架變形或損壞防腐層。在潮濕或腐蝕性環(huán)境中,應采取相應措施,如有損壞應立即處理;鍍鋅電纜盤驗收后應放置在干凈干燥的地方,并用蓋板覆蓋,避免酸、堿等腐蝕性物質(zhì)。
Do not place heavy objects on the cable tray to avoid deformation or damage to the anti-corrosion coating of the overweight cable tray. In humid or corrosive environments, corresponding measures should be taken, and any damage should be dealt with immediately; After acceptance, the galvanized cable reel should be placed in a clean and dry place and covered with a cover plate to avoid corrosive substances such as acid and alkali.
更換橋架前,應召開會議,討論制定一套嚴格的措施和施工方案,并經(jīng)電機部門審查。審核結(jié)束后,準備好各種工具和材料,分配人員,安排好每個人員的具體職責。開工前,到施工現(xiàn)場進行實地勘察,確定需要更換的橋架,制定表格,做好詳細記錄。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://咨詢吧!
Before replacing the bridge, a meeting should be held to discuss and develop a strict set of safety measures and construction plans, which should be reviewed by the motor department. After the audit, prepare various tools and materials, assign personnel, and arrange the specific responsibilities of each person. Before starting work, conduct on-site investigation at the construction site to determine the bridge that needs to be replaced, develop a table, and make detailed records. For more related content, come to our website http:// Consult!
 