安裝電纜橋架的高度可調(diào)范圍及維修保養(yǎng)
電纜橋架安裝高度可在2.2-2.8米范圍內(nèi)調(diào)節(jié)。當(dāng)選擇2.2米時(shí),應(yīng)防止人為拆除和破壞。選擇2.8米時(shí),注意通風(fēng)管道等影響視頻檢測(cè)器視野的其他項(xiàng)目。
The installation height of cable tray can be adjusted within 2.2-2.8m. When 2.2m is selected, artificial demolition and destruction shall be prevented. When selecting 2.8m, pay attention to other items such as ventilation ducts that affect the visual field of the video detector.
支架距車位線的水平距離可在3-4米范圍內(nèi)調(diào)整,雙車位可選擇車行道中間位置(寬度)。該安裝支架應(yīng)為場(chǎng)地起重設(shè)備的較低的安裝位置。在有坡度的地方安裝安裝支架時(shí),安裝支架的坡度應(yīng)與建筑物的坡度一致。在有圓弧的建筑物上安裝支架時(shí),圓弧應(yīng)一致。
The horizontal distance between the bracket and the parking line can be adjusted within 3-4 meters, and the middle position (width) of the roadway can be selected for double parking spaces. The installation bracket shall be the lower installation position of the site lifting equipment. When installing the support at the place with gradient, the gradient of the support shall be consistent with the gradient of the building. When installing supports on buildings with arcs, the arcs should be consistent.
安裝支架應(yīng)“水平和垂直”。安裝支架安裝完成后,用水平儀測(cè)量安裝支架是否符合水平要求,用激光線投影儀確認(rèn)安裝支架是否在一條直線上。
The mounting bracket shall be "horizontal and vertical". After the installation of the installation bracket is completed, use a level meter to measure whether the installation bracket meets the horizontal requirements, and use a laser line projector to confirm whether the installation bracket is in a straight line.
設(shè)備安裝時(shí),應(yīng)重新確定安裝支架的高度和水平距離停車位的寬度。氣動(dòng)球閥安裝選用的支吊架有:雙拉線吊架、單拉線吊架和角鋼支架。
When installing the equipment, the height of the mounting bracket and the width of the horizontal distance from the parking space shall be re determined. The supports and hangers selected for the installation of pneumatic ball valve are: double wire hanger, single wire hanger and angle steel support.
雙拉線吊架由通桿螺釘、拉爆和橫梁組成,每個(gè)吊架由兩個(gè)通桿螺釘組成。單拉線吊架由拉桿螺釘、拉線和吊架組成,單拉線吊架的每個(gè)吊架由拉桿螺釘組成。角鋼支架分為U型支架和L型支架。
The double wire hanger consists of through rod screws, tension blasting and cross beam, and each hanger consists of two through rod screws. The single guy hanger consists of tie rod screws, guy wires and hangers. Each hanger of the single guy hanger consists of tie rod screws. The angle steel support is divided into U-shaped support and L-shaped support.
電纜橋架維修應(yīng)使用干燥清潔的軟布
Dry and clean soft cloth shall be used for cable tray maintenance
1.日常保養(yǎng):定期用干凈的軟布擦拭表面的灰塵。
1. Daily maintenance: regularly wipe the dust on the surface with a clean soft cloth.
2.定期保養(yǎng):用專用的蠟光劑擦拭外部,過一會(huì)兒再用干凈的軟布擦亮,使其轉(zhuǎn)動(dòng)靈活,防銹抗氧化。通常情況下,一個(gè)季度保養(yǎng)一次即可。五金配件、金屬手柄、高溫風(fēng)扇可以用較少的機(jī)油擦拭干燥,防止受潮。軟布擦拭后勾勒出灰塵痕跡。
2. Regular maintenance: Wipe the outside with special wax polish, and then polish it with a clean soft cloth to make it rotate flexibly, rust proof and oxidation resistant. Generally, the maintenance is only required once a quarter. Hardware fittings, metal handles and high-temperature fans can be wiped dry with less oil to prevent moisture. After wiping with a soft cloth, the dust trace is outlined.
3.應(yīng)使用干凈的軟布,并使用專用保養(yǎng)蠟。
3. Use clean soft cloth and special maintenance wax.
以上就是為大家介紹的有關(guān)山東電纜橋架的詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://
The above is a detailed introduction of Shandong cable tray for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with our attitude http://