欧美性爽xxxzzzzzzzz,午夜AV福利老牛,久久99色,国产碰碰福利

網(wǎng)站公告-NOTICE
航豐實業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

橋架的連接件在安裝時要注意什么?

橋架在安裝的時候直線階段之間還有彎通變形直通的連接件,   應(yīng)采用橋架制造廠配套的連接件。連接件薄鋼板厚度不應(yīng)小于橋架薄鋼板厚度。接口應(yīng)平整,無扭曲、凸起和凹陷,連接用的半園頭鍍鋅螺栓,半園頭應(yīng)在橋架內(nèi)側(cè),螺栓長度適當(dāng),擰緊之后,露出長度以2~5牙為宜。水平安裝的橋架,其直線段的連接頭,應(yīng)盡量設(shè)在兩個支吊架之間的1/4左右處。
During the installation of the bridge, there are also curved, deformed, and straight connectors between the straight stages, which should be matched by the bridge manufacturer. The thickness of the connecting thin steel plate should not be less than the thickness of the bridge thin steel plate. The interface should be flat, without distortion, protrusion, or depression. The half round head galvanized bolts used for connection should be on the inner side of the bridge, and the bolt length should be appropriate. After tightening, the exposed length should be 2-5 teeth. For horizontally installed cable trays, the connection head of the straight section should be set at around 1/4 of the distance between the two supports and hangers as much as possible.
1.一般情況下不在施工現(xiàn)場制作橋架。由于特殊原因必需時,可利用現(xiàn)有的橋架改制非標(biāo)準(zhǔn)彎通和變徑直通。改制和切斷直線段橋架時,均不得用氣、電焊切割,應(yīng)用專用切割工具。改制的橋架必須平整,及時補漆,面漆顏色應(yīng)與其它橋架相近。因為新建建筑物里,橋架安裝一般都在混凝土結(jié)構(gòu)工程完成數(shù)月甚一年之后進(jìn)行,混凝土收縮逐漸減小。伸縮量一般不會超過建筑物伸縮縫寬L。
濟(jì)南電纜橋架
1. Generally, cable trays are not manufactured on the construction site. If necessary due to special reasons, existing cable trays can be used to modify non-standard bends and variable diameter straights. When restructuring and cutting straight section cable trays, gas or electric welding cutting is not allowed, and special cutting tools should be used. The restructured cable tray must be flat, repainted in a timely manner, and the color of the topcoat should be similar to other cable trays. In new buildings, the bridge installation is usually carried out months or even a year after the completion of the concrete Structural engineering, and the concrete shrinkage gradually decreases. Generally, the expansion amount will not exceed the width L of building Expansion joint.
2.橋架跨越建筑物的伸縮縫處,按GB50168規(guī)定,應(yīng)設(shè)置伸縮縫,保證橋架及敷設(shè)在橋架內(nèi)的電纜在建筑物伸縮不危及其本身時能自由伸縮,不受損壞。
2. At the Expansion joint where the bridge crosses the building, Expansion joint shall be set according to GB50168 to ensure that the bridge and the cable laid in the bridge can expand freely without damage when the expansion of the building does not endanger its own safety.
3.若發(fā)現(xiàn)或從土建單位了解到建筑物伸縮縫較大有可能超過L時,以便于在橋架中留電纜(或電線)的伸縮余量,這個余量應(yīng)大于伸縮縫寬L。應(yīng)按實際做好伸縮處理。要跨越伸縮縫的橋架少一側(cè)有較長的直線段,宜超過30m,或伸縮縫兩側(cè)直線段橋架相加有30m,中間無水平或垂直彎通。
3. If it is found or learned from the civil engineering unit that the Expansion joint of the building is large and may exceed L, so as to leave expansion allowance for cables (or wires) in the bridge, this allowance should be greater than the width of Expansion joint L. Expansion and contraction treatment should be done according to the actual situation. At least one side of the bridge to cross the Expansion joint has a long straight section, which should exceed 30m, or the straight section bridges on both sides of the Expansion joint add up to 30m, and there is no horizontal or vertical bend in the middle.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318