山東電纜橋架使用過(guò)程中出現(xiàn)短路現(xiàn)象如何解決?
在使用山東電纜橋架的過(guò)程中,遇到問(wèn)題是在所難免的,常見(jiàn)的問(wèn)題是電纜橋架短路,因此下面的橋架生產(chǎn)廠家會(huì)告訴您在使用過(guò)程中應(yīng)該做什么準(zhǔn)備來(lái)避免電纜橋架短路:電纜橋架使用中常見(jiàn)的問(wèn)題是短路,這可能是由于電纜內(nèi)部短路或電纜燒毀等原因造成的。
In the process of using cable tray in Shandong, it is inevitable to encounter problems. The common problem is the short circuit of cable tray. Therefore, the following bridge manufacturer will tell you what preparation should be made to avoid short circuit of cable bridge: the common problem in the use of cable tray is short circuit, which may be caused by internal short circuit of cable or burning of cable.
一般來(lái)說(shuō),電纜質(zhì)量太低。電纜橋架在使用過(guò)程中會(huì)膨脹和收縮。由于環(huán)境溫度的變化,例如鋼電纜橋架會(huì)隨著熱而膨脹,隨著冷而收縮。室外橋架的效果受溫度影響很大。因此,在使用過(guò)程中要注意溫度變化。
Generally speaking, the cable quality is too low. Cable tray will expand and contract in the process of use. Due to the change of ambient temperature, for example, steel cable tray will expand with heat and shrink with cold. The effect of outdoor bridge is greatly affected by temperature. Therefore, attention should be paid to the temperature change in the process of use.
山東電纜橋架
Shandong cable bridge
小編提醒您,在安裝電纜橋架之前,您不僅要滿足所需的荷載撓度,還要根據(jù)建筑物的結(jié)構(gòu)特點(diǎn)、計(jì)算荷載、橋架的尺寸和撓度以及適當(dāng)跨度的確定,考慮安裝的方便性。橋架安裝的準(zhǔn)備工作是在兩個(gè)橋臺(tái)之間架設(shè)腳手架,并鋪設(shè)一個(gè)鞍座板作為氣動(dòng)球閥的鋼橋安裝平臺(tái)。裝載機(jī)將用于從橋臺(tái)到兩側(cè)施工道路的場(chǎng)地平整。畫(huà)出堆場(chǎng)線,并標(biāo)明橋架構(gòu)件、配件和安裝工具的堆放位置。
Xiaobian reminds you that before installing cable tray, you should not only meet the required load deflection, but also consider the convenience of installation according to the structural characteristics of the building, the calculated load, the size and deflection of the bridge and the determination of appropriate span. The preparatory work for bridge installation is to erect scaffold between two abutments and lay a saddle plate as the steel bridge installation platform of pneumatic ball valve. The loader will be used for site leveling from abutment to construction road on both sides. Draw the yard line and mark the stacking position of bridge components, accessories and installation tools.
搖輥、平輥和座板的位置由測(cè)量放線確定。測(cè)量橋架線樁、搖樁、平樁和坐標(biāo)板樁的標(biāo)高。橋架的中間樁應(yīng)測(cè)量到另一側(cè)的鼻架末端可以到達(dá)的距離。橋架架設(shè)所需的附件、架設(shè)工具和各種機(jī)械設(shè)備應(yīng)做好充分準(zhǔn)備,用5t自卸汽車分批運(yùn)施工現(xiàn)場(chǎng)??梢钥紤]室外安裝工藝管道,但應(yīng)注意電纜卷筒應(yīng)安裝在易燃、易爆和低風(fēng)險(xiǎn)的一側(cè)。
The position of rocking roll, flat roller and seat plate is determined by surveying and setting out. Measure the elevation of bridge line pile, swing pile, flat pile and coordinate sheet pile. The distance that can be reached from the end of nose frame on the other side shall be measured at the middle pile of bridge. The accessories, erection tools and various mechanical equipment required for bridge erection shall be fully prepared and transported to the construction site by 5T dump truck in batches. Outdoor installation of process pipeline can be considered, but it should be noted that the cable drum should be installed on the flammable, explosive and low-risk side.
1、外觀檢查山東電纜橋架門(mén)框,進(jìn)入施工現(xiàn)場(chǎng),應(yīng)提交以下資料產(chǎn)品出廠合格證、省市質(zhì)監(jiān)站定期檢驗(yàn)報(bào)告和相關(guān)技術(shù)鑒定文件,如電纜橋門(mén)框板厚度應(yīng)符合相關(guān)要求。鍍鋅電纜橋架涂層表面應(yīng)均勻,無(wú)過(guò)度燃燒、掛灰和局部不鍍鋅等缺陷。靜電噴涂應(yīng)光滑、光滑、均勻、無(wú)皮、無(wú)氣泡,水泡橋架本身應(yīng)光滑、無(wú)扭曲,內(nèi)壁應(yīng)光滑,橋架焊縫表面無(wú)毛刺應(yīng)均勻,不得有漏焊、裂紋、燒穿等缺陷。
1. Appearance inspection of Shandong cable bridge door frame, enter the construction site, should submit the following data, product factory certificate, provincial and Municipal Quality Supervision Station periodic inspection report and relevant technical appraisal documents, such as the thickness of cable bridge door frame plate should meet the relevant requirements. The coating surface of galvanized cable tray shall be uniform without excessive combustion, ash hanging and partial non galvanizing. The electrostatic spraying should be smooth, smooth, even, without skin and bubble. The blister bridge itself should be smooth and free from distortion. The inner wall should be smooth. The weld surface of the bridge should be uniform without burr. There should be no defects such as missed welding, crack and burn through.
2.水平鋪設(shè)橋架時(shí),電纜橋架的安裝位置和離地面的高度不應(yīng)低于2.5m。當(dāng)橋架多層鋪設(shè)時(shí),橋架層間應(yīng)留有一定的距離,以滿足散熱、維護(hù)和防干擾的需要。電纜橋架與各種管線平行敷設(shè)時(shí),其凈距應(yīng)符合相關(guān)規(guī)定。
2. When the cable tray is laid horizontally, the installation position and height from the ground of the cable tray shall not be less than 2.5m. When the bridge is laid in multiple layers, there should be a certain distance between the bridge layers to meet the needs of heat dissipation, maintenance and anti-interference. When the cable tray is laid in parallel with various pipelines, the clear distance shall comply with relevant regulations.
3.支吊架的安裝,電纜橋架支吊架的質(zhì)量應(yīng)符合現(xiàn)行相關(guān)技術(shù)標(biāo)準(zhǔn)。電纜橋架水平敷設(shè)時(shí),支撐跨度一般為1.5 ~ 3 m,垂直敷設(shè)時(shí),固定間距不大于2 m,相鄰兩個(gè)橋架支撐臂之間的水平高差不大于10 mm,相鄰兩個(gè)橋架支撐臂垂直中間線的垂直偏差不大于20m.
3. The installation of supports and hangers and the quality of supports and hangers of cable tray shall comply with the current relevant technical standards. When the cable tray is horizontally laid, the support span is generally 1.5 ~ 3 m; when it is vertically laid, the fixed spacing is not more than 2 m; the horizontal height difference between two adjacent bridge support arms is not more than 10 mm; and the vertical deviation of the vertical middle line of the two adjacent bridge support arms is not more than 20 m
(1)確定方向:根據(jù)建筑布局,結(jié)合空調(diào)管道和電氣管道的設(shè)置條件,方便維護(hù).
(1) Determine the direction: according to the building layout, combined with the setting conditions of air conditioning pipes and electrical pipes, easy to maintain
4.材料統(tǒng)計(jì)
4. Material statistics
(1)橋架:各種類型和規(guī)格的橋架總長(zhǎng)度分別計(jì)算。除了橋架的標(biāo)準(zhǔn)長(zhǎng)度之外,還獲得了橋架的數(shù)量,并且允許增加1%-2%。
(1) Bridge: the total length of various types and specifications of bridge is calculated separately. In addition to the standard length of the bridge, the number of bridges is obtained, and an increase of 1% - 2% is allowed.
(2)立柱:如果采用統(tǒng)一的柱規(guī)格,可用橋架的總長(zhǎng)度除以平均柱間距,得出柱數(shù),余額增加2% ~ 4%。如果列規(guī)格不同,則需要單獨(dú)的統(tǒng)計(jì)數(shù)據(jù)。
(2) Column: if a uniform column specification is adopted, the total length of the bridge can be divided by the average column spacing to get the number of columns, and the balance will be increased by 2% - 4%. If the column specifications are different, separate statistics are required.
(3)托臂:橋架總長(zhǎng)度除以架平均間距,差額增加1% ~ 2%,即為總需求。
(3) Corbel: the total length of the bridge divided by the average spacing of the frame increases by 1% - 2%, which is the total demand.
(4)其它部件:將主要部分的數(shù)量乘以一定的比例,得到總數(shù)。
(4) Other parts: multiply the number of main parts by a certain proportion to get the total number.
山東電纜橋架
Shandong cable bridge
小編認(rèn)為山東電纜橋架需要按照相關(guān)規(guī)定尋找和使用,不同類型電纜橋架的適用范圍不同,因此有必要根據(jù)自身要求尋找合適的橋架使用。不要盲目選擇使用,這樣不僅不能保證使用效果,還會(huì)縮短橋架的使用壽命。希望上述內(nèi)容可以幫到大家,想要了解更多請(qǐng)點(diǎn)擊官網(wǎng):http://
According to the author's opinion, Shandong cable tray needs to be searched and used according to relevant regulations. Different types of cable tray have different application scope, so it is necessary to find suitable cable tray according to its own requirements. Do not blindly choose to use, which not only can not guarantee the use effect, but also shorten the service life of the bridge. I hope the above can help you. For more information, please click the official website: http://