欧美性爽xxxzzzzzzzz,午夜AV福利老牛,久久99色,国产碰碰福利

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類(lèi)
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話(huà):15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://  

廠(chǎng)址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷(xiāo)商地址:天橋區(qū)建華五金市場(chǎng)東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

電纜橋架的支吊架安裝有什么值得注意的?

安裝電纜橋架,應(yīng)該安裝好電纜橋架的支吊架才可以!但是你知道怎么安裝電纜橋架的支吊架嗎?下面濟(jì)南電纜橋架的小編就給大家分析一下支吊架安裝的一些注意事項(xiàng)!
Installation of cable bridge, first of all, should install the cable bridge support hanger can! But do you know how to install the suspension bracket of cable bridge? Next, the small edition of Jinan Cable Bridge Frame will give you an analysis of some matters needing attention in the installation of the suspension frame!
1、架與吊架所用鋼材應(yīng)平直,無(wú)顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無(wú)卷邊、毛刺。
1. The steel used for the frame and hanger shall be straight without significant distortion. The length deviation should be within 3 mm after cutting, and the incision should be free of crimping and burrs.
2、支架與吊架應(yīng)焊接牢固,無(wú)顯著變形,焊接前厚度超過(guò)4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷。
2. The bracket and hanger should be welded firmly without significant deformation. Before welding, the bracket and iron parts with a thickness of more than 4 mm should be grooved. The weld seam should be uniform and smooth. The length of the weld seam should meet the requirements. No cracks, undercutting, gas holes, sags and leakage of welding should occur.
3、架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致.
3. The brackets and hangers should be installed firmly to ensure horizontal and vertical. The brackets and hangers should be installed on buildings with slopes in accordance with the slopes and angles of the buildings.
濟(jì)南電纜橋架
4、吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。
4. Lifting fixtures shall adopt stereotyped products and shall have their own independent lifting fixtures or supporting systems.
5、定支點(diǎn)間距一般不應(yīng)大于1. 5-2m。在進(jìn)出接線(xiàn)盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以?xún)?nèi)應(yīng)設(shè)固定支持點(diǎn).
5. Fixed fulcrum spacing should not be greater than 1.5-2m in general. Fixed support points shall be provided within 500 mm at the ends of outlet junction box, box, cabinet, corner, turning and deformation seam and three ends of T-joint.
6、禁用木磚固定支架與吊架。
6. Prohibit wooden brick fixing brackets and hangers.
感謝您的閱讀與觀看,本文的精彩內(nèi)容來(lái)自:濟(jì)南電纜橋架,我們會(huì)有更多的精彩內(nèi)容繼續(xù)為您呈現(xiàn),詳情請(qǐng)點(diǎn)擊:http://
Thank you for your reading and watching. The wonderful content of this article comes from: Jinan Cable Bridge, we will continue to show you more wonderful content. For more details, please click: http://.
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318