欧美性爽xxxzzzzzzzz,午夜AV福利老牛,久久99色,国产碰碰福利

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場(chǎng)東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

電纜橋架施工要求:

電纜橋架的現(xiàn)場(chǎng)施工條件一般比較惡劣,可能坐落開始建造的發(fā)電廠,也可能坐落開始正在建造的戶外新建鐵路,可能在橋架上,還可能在電纜橋架地道內(nèi),因?yàn)閼敉怆娎|橋架護(hù)套的修補(bǔ)都選用塑焊槍進(jìn)行,并且塑焊槍的加熱需求220V的交流電,而處于新興建造的戶外工程,現(xiàn)場(chǎng)一般都缺少電源,或許有電源可能因?yàn)楝F(xiàn)場(chǎng)電纜橋架的敷設(shè)方位的隨即性,給電源的供給帶來了必定的困難,因而要完成電纜橋架的護(hù)套的修補(bǔ),一方面是人員的到位,另一方面主要是電源的供給,只要作好上述兩件根底準(zhǔn)備作業(yè),才干完成電纜橋架護(hù)套修補(bǔ)作業(yè)的正常展開和進(jìn)行。
The site construction conditions of the cable bridge are generally poor. It may be located in the power plant that started to build, or in the outdoor new railway that is being built. It may be on the bridge frame, or in the underground tunnel of the cable bridge, because the repair of the sheath of the outdoor cable bridge is carried out with plastic welding torch and the heating of the plastic welding torch. The demand for 220V AC power, and in newly built outdoor projects, the site is generally lack of power supply, perhaps the power supply may be due to the site cable bridge laying position of the randomness of the power supply has brought certain difficulties, so to complete the cable bridge sheath repair, on the one hand, the arrival of personnel, the other. The main aspect is the supply of power supply, as long as the above two pieces of preparation work, can complete the cable bridge sheath repair work to start and carry out normally.
山東電纜橋架
為便于電纜橋架場(chǎng)修補(bǔ)作業(yè)的順利進(jìn)行,施工單位要裝備有戶外小型發(fā)電機(jī)。同時(shí)處于現(xiàn)場(chǎng)修補(bǔ)的方便現(xiàn)在供給的塑料焊槍的質(zhì)量要過硬。噴頭加熱面積要大,并且加熱速度要快。并且電纜橋架放線進(jìn)程破損部位具有隨機(jī)性,在一般的城市平和原地區(qū),此項(xiàng)作業(yè)比較好展開,但是在一些山區(qū)地帶,因?yàn)槭盏诫s亂地勢(shì)的影響,電纜橋架的修補(bǔ)作業(yè)其實(shí)是很困難的。因而要削減相應(yīng)方面的投入和快速解決問題,一個(gè)很要害的問題是電纜橋架敷設(shè)進(jìn)程人員的裝備數(shù)量必須滿足,并且選用正規(guī)的電纜橋架敷設(shè)設(shè)備進(jìn)行正規(guī)放線,防止和削減電纜橋架放線進(jìn)程中呈現(xiàn)護(hù)套破損的現(xiàn)象。
In order to facilitate the smooth progress of repairing work of cable bridge yard, the construction unit should equip with outdoor small generators. At the same time, it is convenient for on-site repair, and the quality of the plastic welding guns supplied now must be excellent. The nozzle has large heating area and fast heating speed. Moreover, the damaged parts of the cable bridge are random. In the plain areas of general cities, this work is better carried out. But in some mountainous areas, it is very difficult to repair the cable bridge because of the influence of the disordered terrain. Therefore, in order to reduce the corresponding investment and solve the problem quickly, a very important problem is that the number of equipment personnel in the cable bridge laying process must be met, and the use of regular cable bridge professional laying equipment for regular wiring, to prevent and reduce the cable bridge in the process of wiring sheath damage.


(文章由山東電纜橋架廠家編寫,更多精彩內(nèi)容,歡迎關(guān)注 http://)
(The article was written by Shandong cable bridge manufacturer, more exciting content, welcome to pay attention to http://)
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318